Question
Project round. One system, after launch. Start with the design you intended. Then the failure, including who felt it. Then the measurement, including the unit and the window. Then the change. The interviewer asks what you left alone and why. Answer with one thing you refused to change. Then they ask how you would know the failure had returned. Point at the same measurement. Do not switch projects.